VA Innovation Insights · Laboratory operations
Reducing laboratory turnaround time does not mean rushing a test. It means understanding where samples and information wait, then improving the route from receipt to an authorised result.
In testing and inspection businesses, the delay customers experience may sit before testing starts or after technical work finishes. Missing instructions, uneven workloads and report approval queues can all matter. The right response protects technical validity while making operational problems visible.
Agree the turnaround clock before setting a target
Define the start and finish. Are you measuring sample receipt to report issue, booking to test completion, or another customer commitment? Record calendar or working days consistently and define the handling of customer holds.
Keep visibility of the full customer elapsed time even where an agreed internal measure excludes a hold. Otherwise, a reasonable internal score can conceal a poor customer experience.
Separate test families with different methods and required durations. A single site-wide average may hide an ageing backlog or create unfair comparisons. Useful views include the median, a clearly defined upper percentile, the proportion within the agreed service level and the age of open work.
Map the whole sample journey
Follow a real job through receipt, registration, preparation, testing, technical review and reporting. Include transfers between departments or locations and the information moving alongside the sample.
- Are the requested tests and customer requirements clear at receipt?
- Are samples suitable, identified and stored correctly?
- Can staff see what is ready, waiting or blocked?
- Do preparation and instrument schedules fit together?
- Is completed work waiting for review, clarification or authorisation?
Use timestamps where reliable, but check what system status changes actually represent. A job marked complete in one system may still need review before a report can be issued.
Improve waiting and coordination before changing the method
Confirm readiness
Agree the information and acceptance checks needed before work enters the active queue. Make exceptions visible with an owner and a response route.
Review the queue
Show open work by test family, age, due date and reason for delay. Agree how urgent requests affect existing commitments.
Connect capacity
Plan preparation, equipment availability and authorised staff together. A test slot is not useful if its sample or competent operator is unavailable.
Finish the handover
Clarify what reviewers need and how questions are resolved. Avoid allowing completed technical work to accumulate in an invisible reporting queue.
Illustrative example: testing finished, report still waiting
A laboratory finds that a group of jobs spends substantial time awaiting report clarification. A small trial introduces a completeness check before review and a daily list of unresolved questions, with named owners.
The team checks total turnaround, clarification frequency and report corrections before deciding whether to extend the change. This is an illustrative scenario, not a client result.
Protect the controls that make results trustworthy
Required conditioning, incubation, curing or method durations are not simply delays to remove. Nor should calibration, traceability, quality assurance or authorised review be bypassed to meet a dispatch target.
Changes affecting technical methods, acceptance criteria or reporting controls need the appropriate technical review, approval and validation or verification where required. UKAS explains the foundations of reliable laboratory results in its laboratory accreditation guidance.
Operational improvement can support a laboratory’s management arrangements; it does not itself establish compliance or accreditation. Review turnaround alongside repeat tests, nonconformities, report corrections and staff workload.
Frequently asked questions
Should every test have the same turnaround target?
No. The method, sample condition, batching constraints and customer agreement can differ. Set meaningful service commitments and examine performance within comparable groups.
Is more equipment the answer?
It may be, but first check whether equipment is the limiting resource. The delay could sit in sample preparation, staff authorisation, missing information or reporting.
Can Lean methods work in an accredited laboratory?
They can help investigate flow, queues and responsibilities while retaining required controls. The laboratory remains responsible for its technical decisions and accreditation obligations.
What should we measure first?
Start with a clearly defined customer turnaround measure, open-work age and reasons for delay. Add quality and workload measures so a faster result is not achieved by creating problems elsewhere.
Understand the delay from receipt to report
VA Innovation’s business process improvement support helps connect laboratory activities, information and ownership.
A related laboratory project
Linking laboratory flow with completed work
At CTS Doncaster, VA Innovation combined current-state analysis, value stream mapping, standard work and resource management with daily management and KPI design. Recorded monthly soils and aggregate test completions increased by 94.5% between January and October 2025.
That is a throughput result; turnaround time is a separate measure. Read the CTS Doncaster laboratory improvement case study for the project scope and reporting context.