Lean Six Sigma in ISO 17025 laboratories should improve the way work moves around technical controls, without weakening those controls. Start with avoidable waiting, incomplete information, repeated handling and preventable rework. Keep the validity of the result at the centre of every proposed change.
A laboratory can be busy throughout the day while samples spend much of their time waiting. Understanding that waiting is useful; assuming that every elapsed hour can safely be removed is not.
Keep the standards and improvement roles clear
ISO/IEC 17025 concerns laboratory competence, impartiality and consistent operation. ISO 18404 concerns competencies associated with Lean and Six Sigma personnel and organisations. The latter is not a substitute for laboratory accreditation.
Lean Six Sigma can provide a disciplined way to investigate an operational problem. It does not establish that a test method is appropriate, a result is valid or a laboratory is accredited for an activity. The technical and quality leads must remain involved in decisions affecting their responsibilities.
Separate process delay from necessary technical time
| Observation | Useful investigation | Boundary to preserve |
|---|---|---|
| A sample waits before it is registered. | Check the completeness of booking information and ownership of receipt. | Preserve sample identification and the required receipt checks. |
| Work is waiting for preparation equipment. | Review loading, availability, setup and the order in which work is released. | Keep the approved preparation method and equipment controls. |
| A report waits for review. | Check reviewer availability and the completeness of the review pack. | Retain the required technical review and authorisation. |
| The method specifies conditioning or curing. | Plan the preceding work so the required stage can begin on time. | Do not shorten specified conditions or durations to meet a turnaround target. |
This distinction helps a team discuss time honestly. A waiting period caused by a missing decision needs a different response from a duration required by the method.
Build a timeline for one family of work
Begin with a defined test or sample family. Map receipt, registration, preparation, testing, calculation, review and reporting. Include decision points and routes for unsuitable samples, missing information or repeat work.
For recent jobs, record when each stage became ready, when work started and when it finished. Use the same clock and definitions. If your systems do not capture a useful event, trial a proportionate manual record before commissioning software changes. Avoid asking staff to maintain a large dataset that nobody uses.
Use value stream mapping to connect the whole journey. For a more immediate operational starting point, our guide to reducing laboratory turnaround times looks at the queues between activities.
An illustrative example: reports waiting for release
In a fictional laboratory, managers initially attribute late reports to a shortage of reviewers. Following a group of cases reveals a mixed picture. Some reports are ready for review; others are missing a customer reference, have an unresolved calculation query or are waiting for clarification of the requested reporting format.
The team separates “awaiting technical review” from “not ready for review”. It trials a visible ready queue, allocates time for technical queries and agrees who resolves incomplete job information. The qualified reviewer continues to perform the required review.
During the trial, the team checks queue age, preventable returns and the time spent assembling the review pack. It also checks for unexpected errors and pressure to release incomplete work. Only then does it decide whether the change improves the process.
The scenario is illustrative. It is not evidence that reviewer capacity is sufficient in your laboratory, or a promise that the same change will reduce your turnaround time.
Agree the change with the people who own the controls
Before a trial, ask the technical lead and quality lead which controls might be affected. Depending on the change, the review may need to consider method suitability, competence, equipment status, sample traceability, environmental conditions, measurement uncertainty or data handling.
These questions are prompts for the responsible laboratory team, rather than a complete accreditation checklist. Use your controlled procedures and applicable requirements to decide what verification, validation, authorisation and retained evidence are needed. Keep involvement proportionate to the change and its potential effect.
For example, moving an administrative reminder is different from altering a calculation, preparation sequence or result-transfer interface. Treating both as a routine software adjustment can conceal the technical implications of the second.
Use measures that discourage shortcuts
- Turnaround by work family: compare similar work and explain the start and finish points.
- Queue age: make older cases and the reason for delay visible.
- Readiness: record how often work arrives with the information required for its next stage.
- Preventable rework: distinguish process errors from repeats required by the method or technical judgement.
- Quality signals: review errors, complaints and other relevant evidence alongside delivery measures.
Keep proficiency testing and the assurance of result validity within the laboratory’s established technical arrangements. A good delivery measure cannot replace them. Equally, completing more tests in a shift does not prove that the whole service is faster or more reliable.
Choose one manageable starting point
Select one work family and one recurring problem that the team can influence. Establish the baseline, agree the safeguards and run a bounded trial with a clear review date. If the suspected cause is repeated but unproven, use a structured root cause investigation.
VA Innovation’s operational diagnostic review can help distinguish information, planning, flow and capacity problems. The Practical Improvement Library offers working resources for applying improvement methods; laboratory accreditation and technical decisions remain with the appropriate competent parties.