Lean Six Sigma is an approach to improving processes by understanding customer needs, reducing avoidable waste and investigating variation and defects. It combines practical observation of how work flows with a disciplined use of evidence. The aim is a process that delivers the required outcome more reliably, with clearer ownership of how it works.
For an operations leader, the starting point is a business problem worth solving: missed deliveries, repeat work, a growing backlog or inconsistent service. The methods should help the team understand that problem and test a better way of working.
What does Lean Six Sigma involve?
ASQ describes Lean Six Sigma as bringing together the improvement of flow and waste with investigation of variation and process control. Our Lean versus Six Sigma guide explains how these perspectives can support the same piece of improvement work.
In application, a team needs a clear question, access to the process, usable information and the opportunity to test changes. A collection of completed tools is not evidence that the process has improved. The evidence comes from what happens to the result and how the team maintains it.
How does DMAIC work?
DMAIC stands for Define, Measure, Analyse, Improve and Control. ASQ describes it as a structured approach to improving existing processes. Each phase should leave the team ready to make its next decision.
| Phase | Purpose | A useful review question |
|---|---|---|
| Define | Agree the problem, customer need, scope and goal. | Do we understand the gap we are trying to close? |
| Measure | Understand the current process and establish trustworthy baseline information. | Can we rely on the way performance is recorded? |
| Analyse | Investigate and verify the causes of poor performance. | What evidence connects the cause to the problem? |
| Improve | Test changes that address the verified causes. | Did the change produce the intended effect? |
| Control | Establish ownership, monitoring and a response when performance changes. | Who will keep the new way of working effective? |
The approach gives a team a shared route through uncertain work. It should not prevent a necessary containment action while an investigation continues, or turn a clear, low-risk local improvement into an unnecessarily long project.
What makes a suitable improvement project?
A useful starting project has a meaningful gap, boundaries that people can understand and a sponsor able to support decisions. It should be possible to obtain enough evidence within the time available. “Improve the whole business” is a direction; it is not a manageable first project.
Define the start and end of the process, the customers affected and the result to improve. Record what is outside the project as well. If supplier lead times, commercial decisions or capital approvals are outside the team’s influence, make those dependencies visible from the start.
Choose measures that reflect the customer need. A delivery project might follow orders completed on time and the size of the late backlog. A quality project might track repeat work using a consistent definition. Avoid selecting a convenient measure simply because an existing system can report it.
An illustrative example: a recurring invoicing delay
Imagine a service business where some completed jobs wait for invoicing. This is an illustrative example to show the method, not a VA Innovation client result.
The project could start when a job is confirmed complete and end when an accurate invoice is issued. The team would agree what “complete” and “ready to invoice” mean, then follow a sample of jobs and check the dates rather than assuming every delay begins in finance.
The investigation might distinguish missing customer references, incomplete job records and queries about the agreed scope. Each would need evidence before it became an accepted cause. A small pilot could then test a clearer completion check with one service team.
Review the elapsed time, invoice accuracy and any extra work created by the change. If the pilot is useful, agree who owns the check, how exceptions are resolved and what information is reviewed routinely. A revised form on its own would not finish that work.
What does the organisation need to provide?
The project leader needs time, access and a route for decisions. The people doing the work need a chance to explain exceptions and test whether proposed changes are practical. Technical, quality, finance or IT colleagues should be involved when the change affects their responsibilities.
Leaders should distinguish challenge from blame. A team is less likely to discover a weak handover if recording an exception is treated as an admission of failure. Ask what made the work difficult and what evidence would help the next decision.
For a recurring issue, our root cause analysis guide provides a useful next read. Where the process spans several departments, process mapping, modelling and mining can help clarify the different ways of understanding it.
Do we need training, consultancy or working resources?
That depends on the task and the capability you want to build. Lean Six Sigma consultancy can support the investigation and delivery of a defined improvement. Training and coaching develop the people who will apply the approach themselves.
The belt-level guide explains the different learning roles. A qualification should be selected against the responsibilities the person will take on and the assessment expected.
The Practical Improvement Library provides editable working documents and guidance for self-directed application. It is separate from individual consultancy, project coaching and course certification. If you would like help identifying a sensible first project, contact VA Innovation with the process and challenge in mind.

