CTS / Phenna Group · Leicester

CTS: designing a state-of-the-art materials testing facility

VA Innovation designed the laboratory layouts and operating model for CTS’s state-of-the-art materials testing facility in Leicester. We connected chemistry and microbiology process flow with equipment, people and performance measures, then led the phased operational transition.

Explore the project
Location
Leicester
Project start
November 2023
Delivery
Laboratory layouts implemented; operational transition led

Planning the operation before the fit-out

A new laboratory creates an opportunity to improve how work flows, as well as the building in which it happens. For CTS in Leicester, the design needed to bring together the testing mix, demand, future workload and the practical requirements of chemistry and microbiology operations.

VA Innovation’s engagement began in November 2023. The starting point was the existing way of working, followed by a future-state design that considered the operation as a whole.

Using demand and process evidence to shape the design

  • Pareto analysis: examining the main testing activity to understand where volume was concentrated.
  • Current-state and value stream mapping: understanding the existing sequence of work and the points at which work waited or moved between activities.
  • Demand, pipeline and capacity analysis: considering present workload alongside the requirements of future operations.
  • Operating and resource modelling: examining how staffing and coverage would support a move from two shifts over five days towards operation across a seven-day week.

Designing the facility around the testing process

VA Innovation developed the future-state concept and translated it into building schematics and practical layouts for the chemistry and microbiology laboratories. The design brought equipment, consumables, staffing, safety, health and environmental requirements together around the sequence and flow of testing work.

CTS implemented VA Innovation’s layout. Our work extended beyond the floor plan: we modelled the operating and resource requirements, designed the KPIs and led the operational transition. We also oversaw parts of the fit-out, with more limited involvement in commissioning.

The operating model and its design targets

500 samples per dayCapacity design target across shifts, within a seven-day operating model.
Five-day turnaroundService design target across the major test offerings.

Design targets, not reported operating results. The model set out the capacity and service performance the new operation was designed to support. Post-transition performance data are not included; the completed work covered the implemented laboratory layouts, operational modelling, KPI design and transition leadership.

A phased transition around accreditation constraints

CTS formally opened the Leicester laboratory on 17 July 2024. The opening did not mark the transfer of every laboratory activity: accreditation constraints required a phased transition, with operations continuing across both the existing and new buildings.

This distinction matters when planning a laboratory move. Readiness of the building, readiness of the operation and the ability to transfer accredited activity must be considered together. The transition work addressed the move in that operating context.

The business is now known as Environmental Chemistry Testing (ECT), within Phenna Group. This case study uses CTS to identify the client at the time of the project.

Considering a laboratory move or redesign?

The most useful early questions concern demand, work sequence, constraints and the operating pattern the layout needs to support. Lean consulting and an operational diagnostic review can help build that picture before detailed design decisions are made.

For a practical explanation of the approach, read our guide to a Lean layout event.

Alongside the Leicester facility design work, VA Innovation began an operational improvement engagement at CTS Doncaster in December 2024. The soils and aggregate testing project combined flow analysis, standard work, layout and resource management with leadership development, daily management and KPIs.

Read how recorded monthly test completions at Doncaster increased by 94.5% between January and October 2025. This is a separate project from the Leicester facility and the more recent CTS AI transformation engagement.

Separate engagement · November 2026

New AI and process transformation work with CTS

VA Innovation has begun a new AI and process transformation engagement with CTS, building on our established working relationship. This is a separate piece of work from the completed laboratory-design and transition project described above.

The new engagement is at an early stage, with no measured results to report yet.

Explore how our business process improvement consultancy connects operational processes with technology decisions.

Public project updates

Put improvement into practice

Plan the flow before you plan the floor

Discuss the work your laboratory needs to handle and the constraints a new layout must accommodate.

Continue with a related guide