Revitalising laboratory performance at CTS Doncaster

From understanding demand and bottlenecks to standard work, resource management and daily decisions: practical Lean improvement in a working testing laboratory.

See the operational results
Engagement start
December 2024
Project scope
Soils and aggregate laboratory testing
Results period
January–October 2025

Rebuilding the performance of a working laboratory

VA Innovation’s engagement at CTS Doncaster began in December 2024. Soils testing accounts for the vast majority of the site’s operations, alongside aggregate testing. This project focused on that laboratory operation; concrete cube testing was outside its scope.

The brief was to revitalise operational performance. That meant examining how work moved through the laboratory, how capacity was allocated and how leaders made decisions about priorities. VA Innovation brought those elements together in a practical improvement programme, working with the laboratory team to put changes into daily use.

Understanding demand, flow and the constraints on output

Current-state analysis and value stream mapping established how work passed through the operation. Pareto analysis helped prioritise the main testing activities, while flow and bottleneck analysis examined where work was held up and which constraints needed attention first.

This provided a basis for layout design and resource management. Decisions about where people worked, how activities were organised and what the team should work on next could be considered together, against the needs of the testing process.

Make the work visible

Map the current process, understand the main testing demand and identify the points that limit flow.

Focus the response

Use the analysis to guide layout, standard work, resource allocation and the order in which work is tackled.

Putting the improvements into everyday practice

The programme combined process changes with the management routines needed to support them. Standard work, layout design and resource management addressed how the operation ran. Leadership training focused on decision-making, with daily management and performance measures helping the team follow through on its priorities.

  • Standard work and flow: clearer working methods informed by the current-state and bottleneck analysis.
  • Layout and resources: design work and resource management considered alongside the sequence of laboratory activities.
  • Daily priorities: work-to lists and daily management gave the team a practical basis for deciding what to progress next.
  • Leadership and performance: decision-making training, KPI design and implementation connected operational information with management action.

These improvements were implemented within the working laboratory. The results below relate to this operational improvement project, which is separate from VA Innovation’s Leicester facility design work and the more recent CTS AI transformation engagement.

94.5% more recorded monthly test completions

CTS Doncaster’s management reporting records 561 test completions in January 2025 and 1,091 in October 2025: an increase of 530 completed test records, or 94.5%. Direct staffing recorded in the same report was 13 full-time equivalents in January and 10 in October.

January 2025561Recorded test completions13 direct full-time equivalents
October 20251,091Recorded test completions10 direct full-time equivalents
What the figures measure

These are monthly completed test records, not unique samples. January and October are full reporting months; the partial November 2025 figures are excluded. The comparison is not adjusted for the mix of tests or the number of working days. Staffing is shown as context, not as a calculation of cost savings.

The comparison demonstrates a substantial increase in recorded output over the period. It does not establish a sustained reduction in turnaround time, and turnaround, work waiting and testing quality remain distinct measures when assessing laboratory performance.

Connecting process improvement with management action

Laboratory improvement needs more than a revised floor plan or a new dashboard. The Doncaster project brought process analysis, practical working methods, resources and leadership decisions into the same programme.

If your laboratory is struggling to translate demand into completed work, our Lean Consulting service can help you understand the constraints and agree a practical sequence of improvements. An operational diagnostic review provides a structured starting point, with the scope and your team’s involvement agreed in advance.

For teams applying improvement methods themselves, the paid Practical Improvement Library provides guides, templates and tools. View the access options and prices before choosing a subscription.

Put improvement into practice

Where is work getting held up?

Talk through your testing demand, process constraints and the operational improvements your team needs to deliver.