Supporting growth through better laboratory flow
A testing laboratory depends on more than individual test speed. Sample receipt, preparation, equipment availability, handovers and reporting all influence how quickly work reaches the customer. Celtest’s programme addressed the laboratory as a connected operation, with waste removal and lead-time reduction at its centre.
VA Innovation worked alongside the team on a wider business transformation. The work combined changes to the physical workplace with the skills and management approach needed to continue improving it. Chemistry was a major focus, within a programme that also covered Soils, Aggregate and other testing areas.
What VA Innovation delivered
Strategy and priorities
Strategy creation and deployment connected the improvement initiatives with business priorities and the next stage of growth.
Process understanding
Value stream mapping helped examine how work moved through the laboratory, identify waste and focus attention on lead time.
Practical team capability
White Belt training and root cause analysis training and deployment gave staff a shared approach to identifying and resolving problems.
Lean workplace design
Layout projects addressed the relationship between the work, its sequence and the space in which it was carried out.
Eight areas of laboratory layout improvement
The specific Lean layout projects covered Chemistry, Aggregate, Soils, Advanced Soils, Concrete, Binder & Grading, Sample Receipt and PSD laboratories. Together, these projects formed part of the broader laboratory improvement programme.
The intention was to make the operation easier to run: clearer flow, less unnecessary movement and better alignment between the layout and the work. These principles are relevant wherever multiple tests, equipment and handovers compete for time and space.
The results reported by Celtest
In its public October 2024 update, Celtest reported a 57% reduction in average laboratory turnaround time in 2024 compared with 2023. This was the result reported at that point in the year. It covered the whole laboratory, with the main improvements in Chemistry and further improvement in Soils and Aggregate.
“Under his leadership, our business processes have achieved up to 96% reduction in lead times, significantly enhancing the efficiency and effectiveness of our operations at Celtest Ltd.”
Laboratory Operations Manager, Celtest Ltd
On working with Alexander Jones
Mathew’s endorsement describes up to 96% reduction in process lead times. This is a separate measure from the 57% average laboratory turnaround improvement; it does not mean that every process or the whole laboratory improved by 96%.
The respective improvement projects have been completed and their changes are live. The relationship continues through further contracted work, following positive results and a strong working relationship.
What this means for other laboratories
If testing is technically sound but work still queues between stages, the next opportunity may sit in flow, layout or handovers. Laboratory Lean consulting can help establish the current position, agree meaningful measures and work with your team on practical changes.